OPERATING COST COMPARISON SURFACE MINER AND DRILL & BLAST

Authors

  • Raden Haris Handayana Indonesia Blasting Engineer Society
  • Panji Pratama Hanwha Mining Service Indonesia (HMSI)
  • Jihan Farhan Lubis Hanwha Mining Service Indonesia (HMSI)
  • Sani Salahudin Hanwha Mining Service Indonesia (HMSI)

DOI:

https://doi.org/10.30556/imj.Vol27.No1.2024.1497

Keywords:

operating cost, surface miner, fragmentation, drill and blast, initiation system

Abstract

The method of rock breakage is commonly blasting. A few mining companies in Indonesia with facilities near community residences use alternative methods to breaking rock; one of them is using a surface miner. Aspects considered when choosing the method include economic aspects, especially operating costs. In this study case, the size of material that can continue on the next process is ≤ 400 mm; material from surface miner production is at the target; on blasting results, the fragmentation above the target is reduced using a hydraulic breaker; the initiating systems use an electronic detonator (HEBS II) and a non-electric detonator. This difference will affect the cost of the drill and blast. Based on calculated project data, surface miner operating costs are more costly, with an operating cost per ton of USD 1.16 compared with drill and blast methods including hydraulic breaker costs on the initiation system using an electronic detonator (HEBS II) of USD 0.88 per ton and non-electric operating costs of USD 0.83 per ton.

References

Abzalov, M. (2016) Applied mining geology. Cham: Springer International Publishing (Modern Approaches in Solid Earth Sciences). Available at: https://doi.org/10.1007/978-3-319-39264-6.

Aksoy, C.O. (2009) ‘Performance prediction of ımpact hammers by block punch ındex for weak rock masses’, International Journal of Rock Mechanics and Mining Sciences, 46(8), pp. 1383–1388. Available at: https://doi.org/10.1016/j.ijrmms.2009.02.008.

Anggara, R. (2017) Teknik peledakan. Sawahlunto: Balai Diklat Tambang Bawah Tanah.

Bilgin, N., Yazici, S. and Eskikaya, S. (1996) ‘A model to predict the performance of roadheaders and impact hammers in tunnel drivages’, in G. Barla (ed.) Proceedings of the Eurock 96 – Prediction and Performance in Rock Mechanics and Rock Engineering. Turin, Italy: AGI-Associazione Geotecnica Italiana, A.A. Balkema, pp. 715–720.

Dey, K. and Ghose, A.K. (2008) ‘Predicting “cuttability” with surface miners – A rockmass classification approach’, Journal of Mines, Metals and Fuels, 56(5–6), pp. 85–91.

Ismael, M., Abdelghafar, K., Sholqamy, M. and Elkarmoty, M. (2021) ‘Performance prediction of hydraulic breakers in excavatioin of a rack mass’, Rudarsko-geološko-naftni zbornik, 36(4), pp. 107–119. Available at: https://doi.org/10.17794/rgn.2021.4.9.

Kujundžić, T., Bedeković, G., Kuhinek, D. and Korman, T. (2008) ‘Impact of rock hardness on fragmentation by hydraulic hammerand crushing in jaw crusher’, The Mining-Geology-Petroleum Engineering Bulletin (Rudarsko-geološko-naftni zbornik), 20(1), pp. 83–90.

Malbašić, V., Kovačević, Ž., Čelebić, M. and Crnogorac, J. (2015) ‘Economic cost analysis of drilling and blasting depend of drilling and blasting parameters at quarry “‘Dobrnja’” near Banja Luka’, Archives for Technical Sciences, 2(13), pp. 35–41. Available at: https://doi.org/10.7251/afts.2015.0713.035M.

Nanda, S. and Pal, B.K. (2020) ‘Analysis of blast fragmentation using WipFrag’, International Journal of Innovative Science and Research Technology, 5(6), pp. 1561–1566. Available at: https://doi.org/10.38124/IJISRT20JUN1086.

Ocak, I., Seker, S.E. and Rostami, J. (2018) ‘Performance prediction of impact hammer using ensemble machine learning techniques’, Tunnelling and Underground Space Technology, 80, pp. 269–276. Available at: https://doi.org/10.1016/j.tust.2018.07.030.

Pandey, V.K. and Praksh, S. (2020) ‘Optimization of efficiency of rock breaker using Geological data: Reference to Mumbai, Maharashtra, India’, International Journal of Scientific Research in Engineering and Management (IJSREM), 4(6), pp. 1–6.

Singh, A., Patel, R.K., Rao, M. and Kishore, N. (2017) ‘Cost and economics analysis of continuous surface mminer in major opencast coal mines- A case study’, Minetech, 38(3), pp. 28–34.

Tumac, D. and Hojjati, S. (2016) ‘Predicting performance of impact hammers from rock quality designation and compressive strength properties in various rock masses’, Tunnelling and Underground Space Technology, 59, pp. 38–47. Available at: https://doi.org/10.1016/j.tust.2016.06.008.

Zhou, H., Xie, X. and Feng, Y. (2018) ‘Rock breaking methods to replace blasting’, IOP Conference Series: Materials Science and Engineering, 322, p. 022014. Available at: https://doi.org/10.1088/1757-899X/322/2/022014.

Downloads

Published

2024-04-25